User: vinodced Topic: Energy
Category: Conventional :: Hydel
Last updated: Jul 09 2020 11:17 IST RSS 2.0
 
21 to 40 of 12,559    
A dam of contention in Africa 16.3.2020 Hindu: Op-Ed
International mediation over GERD is no substitute for regional cooperation
Also found in: [+]
A dam of contention in Africa 15.3.2020 Hindu: Home
International mediation over GERD is no substitute for regional cooperation
Also found in: [+]
Shettyhalli: Nod for redrawing boundary brings great relief 11.3.2020 Hindu: Home
Areas where human intervention is high to be excluded from sanctuary limits
Also found in: [+]
TS-Genco gears up to shut down old units of KTPS 10.3.2020 Hindu: National
Starts exercise to redeploy workforce of these units in other stations in State
Also found in: [+]
State eyes 400 MW of solar power in 2 years 2.3.2020 The Assam Tribune
State eyes 400 MW of solar power in 2 years
Also found in: [+]
APSEB engineers call for speedy completion of pending projects 1.3.2020 Hindu: National
In a letter, AAEEA urges Energy Secretary to drop move to sell RTPP
Also found in: [+]
NEEPCO employees await Centre’s next step 29.2.2020 The Assam Tribune
NEEPCO employees await Centre’s next step
Also found in: [+]
Funds to be earmarked in Karnataka Budget for Kalasa-Banduri project 28.2.2020 Hindu: Diet & Nutrition
A day after the Centre’s notification of the Mahadayi inter-State water dispute tribunal award, Chief Minister B.S. Yediyurappa said on Friday that t
Also found in: [+]
Tribals to heighten protest over Ajodhya Hills hydel project 27.2.2020 Hindu: Home
Calcutta High Court Division Bench hearing the matter; July 2019 order ‘quashed’ permissions granted by the State govt.
Also found in: [+]
Govt. may bundle power sources for grid stability 21.2.2020 Hindu: Rx
Plan offers hope for stressed assets
Also found in: [+]
How power outages can be avoided when solar generation is erratic 21.2.2020 Citizen Matters, Bengaluru
During the December 26th solar eclipse, Karnataka's solar power generation dipped by 90% at one point. Given that even clouds can interrupt solar power generation, and given our increasing dependence on solar, how do we deal with this problem?
Also found in: [+]
Mani rules out power cut, load-shedding 20.2.2020 Hindu: Policy & Issues
970 complaints settled at KSEB adalat
Also found in: [+]
Jagan asks Discoms to scout for low-cost power 20.2.2020 Hindu: Rx
Focus should be on hydro reverse pumping projects, he says
Also found in: [+]
Rally against LSHEP project 7.2.2020 The Assam Tribune
Rally against LSHEP project
Also found in: [+]
Hydro power projects to come up soon in the state: Minister Biswajit 5.2.2020 Manipur: E-Pao
Hydro power projects to come up soon in the state: Minister Biswajit
Also found in: [+]
Hydropower projects in pipeline 4.2.2020 Manipur: E-Pao
Hydropower projects in pipeline
Also found in: [+]
BHEL secures order for hydroelectric project in Nepal 3.2.2020 Projects Monitor

Bharat Heavy Electricals (BHEL) has secured order for the electro mechanical (EM) works for 40 MW Rahughat Hydroelectric Project in Nepal. The order has been placed on BHEL by the Raghuganga Hydropower (RGHPL), a company 100 percent owned by the Nepal Electricity Authority (NEA), the sole public power utility in Nepal and owned by the […]

The post BHEL secures order for hydroelectric project in Nepal appeared first on India's first NewsPortal on Projects.

Also found in: [+]
No Power from Sardar Sarovar 29.1.2020 Central Chronicle
The last massive dam of River Narmada in Gujarat the Sardar Sarovar has stopped the hydro power generation from its 1450 megawatt power plant due to unprecedented water shortage in the mighty river Narmada. The power plant is shut down indefinitely obviously till next rainy season. The Gujarat Government has decided to use the entire remaining water for providing drinking water. Under the Narmada Valley Project there are four dams on the river – three Bargi, Indira Sagar, Omkareshwar in Madhya Pradesh and the last Sardar Sarovar in the highest of all the four is in Gujarat. In the project most of the land of Madhya Pradesh is submerged. It was decided in the hydro power the biggest share of 57 per cent of power will be of Madhya Pradesh. But when Gujarat Government has shut down the hydro plant from the hydro power to Madhya Pradesh now it is zero. In the Sardar Sarovar the water storage is reduced upto 45 per cent, which is lowest in the last 15 years. This year it was deficient rains in the ...
Also found in: [+]
No Power from Sardar Sarovar 25.1.2020 Central Chronicle
The last massive dam of River Narmada in Gujarat the Sardar Sarovar has stopped the hydro power generation from its 1450 megawatt power plant due to unprecedented water shortage in the mighty river Narmada. The power plant is shut down indefinitely obviously till next rainy season. The Gujarat Government has decided to use the entire remaining water for providing drinking water. Under the Narmada Valley Project there are four dams on the river – three Bargi, Indira Sagar, Omkareshwar in Madhya Pradesh and the last Sardar Sarovar in the highest of all the four is in Gujarat. In the project most of the land of Madhya Pradesh is submerged. It was decided in the hydro power the biggest share of 57 per cent of power will be of Madhya Pradesh. But when Gujarat Government has shut down the hydro plant from the hydro power to Madhya Pradesh now it is zero. In the Sardar Sarovar the water storage is reduced upto 45 per cent, which is lowest in the last 15 years. This year it was deficient rains in the ...
Also found in: [+]
Arunachal can produce 40,000 MW of hydropower: Dy CM 12.1.2020 The Assam Tribune
Arunachal can produce 40,000 MW of hydropower: Dy CM
Also found in: [+]
21 to 40 of 12,559